R5
RAPID5
Ingestion

Pipeline operator console

Live view of documents flowing from source connectors through parsing, enrichment, validation and routing into the AI-ready knowledge index.

Live · updated 14s ago
In flight
125
Published today
1,752
Failed today
76
Docs / 24h
2,798

Pipeline stages

Click a stage to filter the in-flight table below.

Source connectors

Where documents come from.

SP
SharePoint / M365
Group tenant · 14 sites · delta sync
Healthy
Last sync
2m ago
Docs / hr
128
Today
1,420
Connected
//
Network drives (SMB)
Le Locle + Biel shares · 3 folders slow
Degraded
Last sync
11m ago
Docs / hr
42
Today
388
Connected
Supplier portals + email
Nivarox, ETA, ceramic vendors · IMAP intake
Healthy
Last sync
6m ago
Docs / hr
19
Today
154
Connected
Manual upload + PLM/ERP
Design studio · SAP PLM nightly export
Healthy
Last sync
24m ago
Docs / hr
8
Today
62
Token expiring

Throughput · 24h

Documents ingested per hour.

-24hpeak 177/hrnow

Documents in flight

44 documents currently moving through the pipeline.

DocumentSourceStageTime in stageConfidenceRouting
Stainless_904L_Bezel_Insert_Composition_Sheet_7710.pdf
IF-001 · 3,910 KB
SharePoint / M365
Intake2m ago
59%
→ Curator
Lubrication_Point_Update_Cal_9244_9244.pdf
IF-002 · 5,932 KB
Network drives (SMB)
Parse2m ago
76%
Pending
Thermal_Cycling_Procedure_v2_6048.pdf
IF-003 · 7,143 KB
Supplier portals + email
Intake46s ago
72%
Pending
ISO_3159_Chronometer_Standard_Internal_Notes_9436.docx
IF-004 · 4,097 KB
Manual upload + PLM/ERP
Enrich47s ago
95%
Auto-publish
Anti-Magnetic_Test_Results_Breguet_Cal_1862_1862.xlsx
IF-005 · 1,197 KB
SharePoint / M365
Parse44s ago
70%
Pending
Glashtte_Original_Heritage_Dial_Study_7454_7454.pdf
IF-006 · 3,956 KB
Network drives (SMB)
Validate2m ago
59%
→ Curator
Longines_Retail_Presentation_Standard_7930.eml
IF-007 · 2,983 KB
Supplier portals + email
Parse57s ago
63%
→ Curator
Co-Axial_Escapement_Assembly_Guideline_Blancpain_5054.pdf
IF-008 · 8,544 KB
Manual upload + PLM/ERP
Enrich3m ago
64%
→ Curator
Leather_Strap_Supplier_Traceability_Certina_8132.pdf
IF-009 · 3,012 KB
SharePoint / M365
Validate59s ago
52%
→ Curator
Blancpain_Movement_Family_Consolidation_2009_9308.pdf
IF-010 · 4,858 KB
Network drives (SMB)
Intake2m ago
58%
→ Curator
Omega_Titanium_Gr-5_Case_Alloy_Specification_v1_7296.docx
IF-011 · 7,456 KB
Supplier portals + email
Enrich1m ago
79%
Pending
Lubrication_Point_Update_Cal_4050_4050.xlsx
IF-012 · 5,391 KB
Manual upload + PLM/ERP
Intake2m ago
64%
→ Curator
Magnetic_Field_Exposure_Test_4323_4323.pdf
IF-013 · 7,471 KB
SharePoint / M365
Route2m ago
92%
Auto-publish
Group_Standard_Water_Resistance_Terminology_7513.eml
IF-014 · 3,098 KB
Network drives (SMB)
Publish3m ago
82%
Auto-publish
Water_Resistance_Validation_8722_300m_8722.pdf
IF-015 · 392 KB
Supplier portals + email
Validate15s ago
59%
→ Curator
Hand_Finishing_Reference_Harry_Winston_5281_5281.pdf
IF-016 · 4,204 KB
Manual upload + PLM/ERP
Enrich2m ago
82%
Pending
ETA_Movements_Warranty_Service_Guideline_7845.pdf
IF-017 · 1,201 KB
SharePoint / M365
Parse14s ago
83%
Pending
Crown_Gasket_Installation_Glashtte_Original_2746_2746.docx
IF-018 · 6,213 KB
Network drives (SMB)
Parse37s ago
84%
Pending
Leather_Strap_Supplier_Traceability_Rado_3185.xlsx
IF-019 · 1,110 KB
Supplier portals + email
Enrich3m ago
88%
Auto-publish
ETA_Movements_Movement_Family_Consolidation_2003_1920.pdf
IF-020 · 3,599 KB
Manual upload + PLM/ERP
Intake3m ago
72%
Pending

Error queue

Documents blocked at a stage. Retry, or route to a human curator.

DocumentFailed atReasonSourceAgeActions
Hand_Finishing_Reference_Balmain_8985_8985.docx
ERR-001
Parse
OCR confidence < 0.5
Scanned pages 3–7, low contrast
Network drives (SMB)
13m ago
Water_Resistance_Validation_8722_300m_8722.xlsx
ERR-002
Intake
Unsupported format
.dwg CAD file — no parser registered
Supplier portals + email
1h 44m ago
ISO_3159_Chronometer_Standard_Internal_Notes_2706.pdf
ERR-003
Intake
Duplicate detected
Content hash matches KN-0050
Manual upload + PLM/ERP
51m ago
Shock_Test_Protocol_ISO_1413_Balmain_5745.eml
ERR-004
Validate
Missing required metadata
Field 'material' could not be extracted
SharePoint / M365
2h 57m ago
Line_4_Regulation_Adjustment_Longines_4652.pdf
ERR-005
Intake
Virus scan failed
ClamAV: EICAR-Test-Signature
Network drives (SMB)
9m ago
Bronze_Bezel_Insert_Composition_Sheet_3284.pdf
ERR-006
Parse
Parse timeout
Exceeded 30s on 214-page PDF
Supplier portals + email
1h 36m ago
Decision_Log_Silicon_Balance_Adoption_1999_9675.pdf
ERR-007
Validate
Schema validation failed
'confidence' outside [0,1]
Manual upload + PLM/ERP
11m ago
Ceramic_Bezel_Vendor_Audit_1261_1261.docx
ERR-008
Parse
OCR confidence < 0.5
Scanned pages 3–7, low contrast
SharePoint / M365
1h 38m ago
Co-Axial_Escapement_Assembly_Guideline_Breguet_6494.xlsx
ERR-009
Intake
Unsupported format
.dwg CAD file — no parser registered
Network drives (SMB)
1h 46m ago
Rado_Brand_Voice_Guidelines_6884.pdf
ERR-010
Intake
Duplicate detected
Content hash matches KN-0099
Supplier portals + email
1h 19m ago
Glashtte_Original_Heritage_Dial_Study_2004_2004.eml
ERR-011
Validate
Missing required metadata
Field 'material' could not be extracted
Manual upload + PLM/ERP
3h 7m ago
Tissot_Chronometer_Batch_7477_COSC_Report_7477.pdf
ERR-012
Intake
Virus scan failed
ClamAV: EICAR-Test-Signature
SharePoint / M365
3h 18m ago
Group_Standard_Water_Resistance_Terminology_7501.pdf
ERR-013
Parse
Parse timeout
Exceeded 30s on 214-page PDF
Network drives (SMB)
2h 49m ago
Thermal_Cycling_Procedure_v6_3256.pdf
ERR-014
Validate
Schema validation failed
'confidence' outside [0,1]
Supplier portals + email
3h 12m ago

Recent completed runs

Batch history over the last 90 days.

BatchIngestedDocsMissingDuplicatesAvg conf.ProgressStatus
Movement Engineering Archive — Nov 2026
BATCH-2026-11
11/12/2026423187%
62% approved
Ready for ReviewReview →
Supplier Audit Reports Q3
BATCH-2026-10-B
10/30/2026280479%
100% approved
CompleteReview →
Design Studio — Heritage Dial Study
BATCH-2026-10-A
10/14/2026185071%
33% approved
Ready for ReviewReview →
Compliance — REACH & RoHS Updates
BATCH-2026-09
9/22/2026121092%
100% approved
CompleteReview →
Manufacturing Notes — Line 4
BATCH-2026-11-B
11/18/2026357268%
14% approved
ProcessingReview →
Testing Procedures — ISO Refresh
BATCH-2026-11-C
11/20/202690094%
66% approved
Ready for ReviewReview →

Ingestion telemetry is simulated for this demo. Stage counts, connector health, in-flight documents and error reasons are deterministic and internally consistent with the mock corpus.